Acrylic Synthetic Court
Multi-layer acrylic for tennis, basketball, volleyball and handball — laid over concrete or asphalt, marked to federation dimensions.
Nine sports flooring surfaces for courts, tracks, halls, gyms and play areas — specified around the sport, the hours of play and whether the surface lives indoors or under the Coimbatore sun.
Our three disciplines
Playing surfaces
Ball response, grip, shock absorption and sun resistance pull in different directions. We start from how the space will actually be used — one sport or five, two hours a week or ten a day — and specify from there.
Multi-layer acrylic for tennis, basketball, volleyball and handball — laid over concrete or asphalt, marked to federation dimensions.
Rubber-filled cushion layers under the colour coats. Takes the load off knees and ankles where a court is played on for hours at a time.
Seamless polyurethane for indoor multipurpose halls — consistent ball bounce, controlled slip, and a joint-free surface that mops clean.
Sandwich and full-PU running tracks in EPDM granule, laid to fall and finished with lane marking and take-off boards.
Sprung timber on a battened or cradle sub-frame for badminton and basketball, sealed and marked for competition play.
Roll-out vinyl in badminton and table-tennis grades — the quickest way to bring an existing hall up to match standard.
Monofilament turf with sand and rubber infill for football, hockey practice, cricket nets and landscaped multi-use areas.
Rubber tile and roll flooring for free-weight zones, cardio floors and CrossFit boxes — impact absorbing and quiet underfoot.
Seamless wet-pour safety surfacing for school and residential play areas, laid to the fall height the equipment needs.
Choosing
Outdoor — acrylic, EPDM or turf, all UV stable.
Indoor — PU, vinyl or timber.
Low — non-cushioned acrylic, polished timber.
High — cushioned acrylic, PU, EPDM.
Light club use — acrylic or vinyl.
All-day school or academy use — cushioned or PU.
Straightforward — acrylic, PU, vinyl.
Restricted — timber, turf.
Lower — acrylic, vinyl roll.
Higher — PU, EPDM track, sprung timber.
Acrylic — colour and lines at roughly year five to eight.
PU and vinyl — longer, with periodic sealing.
Base & preparation
A synthetic surface is two to fifteen millimetres thick. It cannot correct a slab that ponds water, moves at the joints or was never cured properly — it will copy those faults, and it will copy them within the first season.
Marking & handover
Lines are set out from the true centre and diagonals, not from the walls, because very few halls are square. Multi-sport courts get one clear primary colour for the main sport and a quieter secondary colour for the rest, so the playing surface stays readable.
FAQ
On a sound existing slab, an acrylic court is normally six to nine working days for the levelling, cushion and colour coats plus line marking. On a new slab, add the concrete curing period — the surface cannot go down until the slab has cured and dried out fully.
Non-cushioned is the harder, faster and cheaper surface, and it suits schools and clubs where budget leads. Cushioned adds two to five rubber-filled layers underneath and takes load off the players’ knees, which matters where the court is used for several hours a day.
Cracks have to be dealt with first. Static cracks are routed, filled and reinforced; moving cracks and joints have to be carried through the new surface or they will telegraph back within a season. Coating straight over a cracked base is the most common reason a court fails early.
Yes. Multi-sport courts are set out and marked to federation dimensions in durable court paint, with a clear primary colour for the main sport and a secondary colour for the others so play stays readable.
Keep it clear of grit and standing water, wash it down two or three times a year, and keep the surrounding drainage working. An acrylic court will normally want a fresh colour and line coat somewhere between year five and year eight, depending on use and sun exposure.
Free site inspection
Tell us the area, whether it is indoors or out, and how many hours a week it will be played on. We will come back with the system, the thickness and the programme.